Explore PK-8 Construction Updates

  • UPDATE – Jan. 17, 2020

    Posted by Andy Leapley on 1/17/2020
    • Crews at Explore PreK-8 are putting the finishing touches to the nature-based playground equipment, including the newly-installed swing set and zipline!
    • Next week, concrete is scheduled to be poured, locking everything in place.
    • On the west side, the preschool playground has a tractor-themed jungle gym setup, perfect for Explore's youngest learners!
    • In the grand hall, the fireplace stonework is done and crews are now painting the drywall in the cafeteria, offices, and library.
    • In the east wing of classrooms, the floors are polished and covered.
    • Casework, light fixtures, backpack hooks, and paint remain ongoing throughout the school.
    Comments (-1)
  • UPDATE – Jan. 9, 2020

    Posted by Andy Leapley on 1/9/2020
    • As the Bienenstock crew draws closer to completion of the main playground, work has begun on the preschool playground area. 
    • At the front entrance, final touches are in progress to the metal for the silo. 
    • Inside the building, the fireplace stonework now runs top to bottom. Only finishing touches remain surrounding the dual firebox openings. 
    • Starting in the 7th and 8th-grade classroom commons, crews have begun polishing the concrete floors. 
    • By the end of January, the gym will get their barn doors installed! 
    Comments (-1)