UPDATE – January 11, 2019

Posted by Andy Leapley on 1/22/2019

  • Foundations and columns for the trash enclosure north of the building have been installed.
  • The associated concrete pads are nearly complete as well.
  • Irrigation mains have been installed at the upper site.
  • New flatwork has been poured around the upper parking lot, and the shade structure has been successfully relocated.
  • Retaining wall installation is complete at the playground ramp and along the upper site slope.
  • The revised Expeditionary Learning principles are installed. f. The final Certificate of Occupancy was issued on December 7, 2018.