UPDATE – Aug. 9, 2019

Posted by Andy Leapley on 8/9/2019

  • Interpretive signage package and decorative memorial bench designs are being prepared. 
  • Site grading for concrete walkways is complete with concrete flatwork scheduled to begin shortly.
  • The Welby Learning Park is scheduled to be completed by November 2019.